| Technical Instructions |
||
| CTI11 | Saver
Sub Breakout and Installation Field Procedure Left Hand Thread |
Oct 28/04 |
| CTI10 | QXR Feed Chain Adjustment | Oct 28/04 |
| CTI7.Rev2 | Air Swivel Breakout U/G Drills | Jan 06/06 |
| CTI12Rev1 | Air Swivel Breakout QXR | Jan 06/06 |
| CTI6.Rev6 |
Saver
Sub Breakout and Installation Field Procedure |
Jan 06/06 |
| CTI3 | Drill Pipe Thread Gage | Jul 26/02 |
| CTI4 | Drill Pipe Go-NOGO Gage | Jul 26/02 |